Navigara

João "Pisco" Fernandes

90d · built 2026-09-08

Performance

What João "Pisco" Fernandes shipped in the selected window, measured in ETV, and how it compares with the 90 days before it.

Effective capacity

+4.6engineers

delivers like 5.6 (5.6x pre-AI)

Output (ETV)

1.4ETV

+650.0% vs 0.2 prior

Features share

0.7%

+0.7 pp vs prior window

Fixes share

0.0%

−38.9 pp vs prior window

Work mix

0.7% Features40.7% Maintenance48.9% Tests9.6% Docs0% Fixes

19 commits over 90 days, ending 2026-09-08.

Daily performance

Daily ETV, stacked by Features, Maintenance, Tests, Docs and Fixes.

Repository spread

Where this developer's commits land. Concentrated work (top1 > 80%) vs polymath spread (top1 < 30%).

94.1 % of commits in cloudflared

Focused
RepoCommitsETV
cloudflared161.3
cloudflare-docs10.0