Navigara

Mike Griese

90d · built 2026-11-06

Performance

What Mike Griese shipped in the selected window, measured in ETV, and how it compares with the 90 days before it.

Effective capacity

+6.1engineers

delivers like 7.1 (7.1x pre-AI)

Output (ETV)

19.2ETV

+105.0% vs 9.4 prior

Features share

31.4%

−23.1 pp vs prior window

Fixes share

8.4%

−3.1 pp vs prior window

Work mix

31.4% Features25.7% Maintenance32.2% Tests2.3% Docs8.4% Fixes

33 commits over 90 days, ending 2026-11-06.

Daily performance

Daily ETV, stacked by Features, Maintenance, Tests, Docs and Fixes.

Repository spread

Where this developer's commits land. Concentrated work (top1 > 80%) vs polymath spread (top1 < 30%).

84.4 % of commits in PowerToys

Focused
RepoCommitsETV
PowerToys2716.9
terminal52.4

Most impactful commits

Top 10 by ETV in the last 90 days.