Navigara

Victor Genaev

90d · built 2026-09-30

Performance

What Victor Genaev shipped in the selected window, measured in ETV, and how it compares with the 90 days before it.

Effective capacity

+1.8engineers

delivers like 2.8 (2.8x pre-AI)

Output (ETV)

8.7ETV

−61.3% vs 22.4 prior

Features share

31.3%

+4.2 pp vs prior window

Fixes share

5.0%

+4.6 pp vs prior window

Work mix

31.3% Features31.2% Maintenance18.9% Tests13.6% Docs5% Fixes

27 commits over 90 days, ending 2026-09-30.

Daily performance

Daily ETV, stacked by Features, Maintenance, Tests, Docs and Fixes.

Repository spread

Where this developer's commits land. Concentrated work (top1 > 80%) vs polymath spread (top1 < 30%).

100.0 % of commits in fluentui

Focused
RepoCommitsETV
fluentui278.7

Most impactful commits

Top 10 by ETV in the last 90 days.