Performance Analysis · Q2 2025 – Q2 2026
Performance is measured via Complexity Performance — the rate at which engineers deliver complex features. Each commit is analyzed for the complexity of the change and categorized into Growth (new value creation), Maintenance (sustaining existing systems), and Fixes (rework / throwaway code). Higher performance means complex features are shipped faster.
Cumulative contribution over time. Watch developers race as positions shift month by month.
Commit activity distribution by hour and day of week across the entire organization.
Where is engineering investment actually going? Flow: Organization → Repositories → Work Type (Grow / Maintenance / Fixes). Latest quarter. Wider flows = more investment.
Who has the strongest momentum right now? Cumulative momentum = Σ(delta_perf × grow%) / (1 + waste%). Use the play button to animate the race. Top 10 developers.
Are there predictable seasonal patterns in productivity? 12-axis radar shows multi-year average vs. current year performance. Deviations above average = above-seasonal productivity.